Shoring and Reshoring in RC Building Construction -

Shoring and Reshoring of a multistory Reinforced Concrete Building

Freshly poured concrete hardens within a few hours but needs about four weeks to reach full design strength. In multistory cast-in-place buildings, this waiting period can delay construction schedules, so engineers often remove formwork earlier and use shoring and reshoring to safely transfer loads to lower floors that have gained more strength. With proper planning, floor cycles can be reduced to about two weeks. Shoring […] Read More

Earthquake Failures in Buildings -

This is one of the posts in a series of our posts that we discuss failures. Also check out the other posts in constructmagazine.com, where we discuss failures in different contexts of civil engineering. A Brief Introduction of Earthquakes vs. Structures: Earthquakes are very important aspect of most design in civil engineering, and for any type of structure. The fundamental earthquake principles as it applies […] Read More

Structural Engineering Failures -

Structural engineering is a major branch of civil engineering, and realistically the first thing that comes to mind of many, when the words civil engineering are mentioned. It deals with designing the body of all types of structures and their supplementary components, connections, attachments per the criteria given in codes, to ensure public comfort and safety. As we mentioned in the previous post in Construct […] Read More